Hi All,
I measured the Performance of the MRP-Live for around 110 Materials on two different Systems.
A SAP ERP 6.0 EHP 7 SP 2 on a classical Oracle DB need around 14 second for the job.
The MRP on a SAP ERP 6.0 EHP 7 SP7 with a hp SAP HANA DB need for the same job around 60 seconds.
Whats your experieance or ideas?
Regards!