Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 3189

Upgrade SAP PI or not???

$
0
0


Hi,

in the company wants to implements ARIBA.

Ariba should consume data from ERP, this maybe will be an new server (ERP 6.06 + add-on ariba Integration suite 1.0)

SAP PI will be used to exchange data between each other.

 

we have PI 7.11.

 

I understand that ERP 6.0 ehp6 upgrade th SWC SAP_BASIS to version 7.31.

 

i am a little confunse about this:

 

if the SWC SAP_BASIS in the ERP is 7.31, should i upgrade my SAP PI to 7.31, or only needs to import the SWC SAP_BASIS 7.31 to my ESR so, i can avoid to upgrade the PI???????

 

 

 

i read the blog: http://scn.sap.com/community/it-management/alm/software-logistics/blog/2012/12/21/why-ehp6-for-sap-erp-60-contains-sap-basis-731

 

Evolution of code lines for software component SAP BASIS

Let us focus on one prominent software component of the foundation of each ABAP system: SAP BASIS. After SAP NetWeaver 7.0 was released, the code line of SAP BASIS 7.0 was split. On the one hand, this allowed faster innovation for technology solutions like SAP NetWeaver Process Integration (PI), based on SAP BASIS 7.1, 7.11 and above (until 7.3). At the same time, the SAP Business Suite based applications like SAP ERP had the requirement of a stable core. This lead to the code line 7.0, 7.01, and 7.02.

Meanwhile SAP has reached a high degree of interoperability between SAP Business Suite based application systems (like SAP ERP) and SAP NetWeaver based technology systems (like PI). So it was possible to merge the two code lines back into one – and this one had to be named 7.31.

 

i think the answer is in front of my eyes but i think i cant understand it at all.

 

 

Rgds

Rodrigo


Viewing all articles
Browse latest Browse all 3189

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>