Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 3189

Billing Plan and Schedule Lines for Contract Create.

$
0
0

Hi All,

 

I am using the Function Module SD_SALESDOCUMENT_CREATE For Creating a Contract. I am doing my Code in the Method of a Proxy of a PI

 

Class. I Would be getting the Values from Sales Force and I need to Create a Contract in SAP. This is the Inbound Interface to SAP.

 

Now  I have manged to Fill up the Fields for Items  and Partners. I need to now Create the Billing Plan and Schedule Lines in the Contract. Somehow the Fields Mentioned in the Proxy Structure for Billing and Schedule Lines Do not match with the BAPI strcutures and hence I am in a Dilema.

 

My colleagues says that I need to Write a BDC for Billing Plan and the Schedule Line Items. But I want to Avoid BDC as far as possible.

 

Can any one please help me  with the Creation of Billing Plan and Schedule Line Items using either the Function Module post Creating the Basic Contract OR using the Same FM as mentioned above.

 

The Fields that I am getting From the Sales Force are as follows:

 

Billing Plan:

 

CONTROLLER

LINE_ITEM_NUMBER

CONTRACT_START_DATE

CONTRACT_END_DATE

USAGE_INDICATOR

HIGHER_LEVEL_ITEM_IN_BOM

PAYMENT_METHOD

POEXPIRY_DATE

MIN_COMMITMENT_DATE

BILLING_GRP_NUMBER

BILLING_SEQUENCE_NUMBER

INVOICE_GROUP_NUMBER

BILLING_FREQUENCY

BILLING_DEVIATION

BILLING_IN_ADVANCE

ORDER_NUMBER_IN_ADD_DATA_B

 

For Schedule Line Items:

 

CONTROLLER

LINE_ITEM_NUMBER

BILLING_DATE

BILING_VALUE

BILLING_BLOCK_FOR_BILLING

GRNNUMBER

TEXT_OBJECT

 

Please Guide me the Right way with the FM or any other way to have the Billing Plan and Schedule Line Items Populated in the Contract Create Process Via PI.

 

Many Thanks in Advance...!!!

 

Regards,

Deepak.


Viewing all articles
Browse latest Browse all 3189

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>