Hello,
I have an issue and I hope you can help me with it. So, I have created a Subcon PO with PR.. now in MD04 the requirements are open for Raw material components.
Then I deleted the SUBCON PO + PR and then Re -run MRP but still system shows the open requirement in MD04 as Subreq.. can anybody tell me how to remove that subreq requirement because i have deleted PO+PR but still it shows the requirements as open..?
Thank you,