Hi Dear Experts,
I have such a requirement that we need to control the output type for billling. By now we have lots of output types in system, while some of them share the same Access Sequence. Then user want to control one output type different from others. We find that some other output also goes into the new requirement I created. In VV31/32/33, our current criterion could not separate them, some output we do not want also goes to check the new requirement. Now I think maybe the only way to control them by check the output type in the requirement. But in my previous projects, I do not have such experience to control requirement by check output type, this should be done in VV31. So could you please give me any hints? Thank you.
BR
Jay